Vibe Coder · Unit 15: Deploy on Vercel · Lesson 7 of 7
Build settings and CI
Engineers: make deployment depend on passing checks, separate environments, and run migrations as part of the release.
Read the short notes and pictures.Do everything inside a blue frame.
Reliable releases
Vercel deploys on every push. Making that safe means putting your checks in front of the merge, giving each environment its own configuration and data, and making schema changes part of the pipeline.

What to set up
Required checks
Type-check, lint, tests and build must pass to merge.
Environment separation
Separate keys and, ideally, a separate database for preview.
Migrations in the pipeline
Applied automatically, before or with the deploy.
Rollback
Know how to promote the previous deployment.

Release hygiene
Small pull requests
Easier to review and to revert.
A smoke test after deploy
An automated check of the main path on production.
Alerts
On error rates and failed deploys.
Harden your release process
Make CI a required check, separate preview and production configuration, run migrations in the pipeline, and add a post-deploy smoke test. Practise a rollback once.
Done when
Your release process is repeatable.
Keep these
- Gate deploys on CI.
- Separate environments.
- Automate migrations and practise rollback.